Quote:
Originally Posted by Neil M
Level 0 (Sub-Level/Basement) Level 1 (Ground Floor) and so on. Makes it much easier using floor plans
Hollow Pot & Beam floor with reinforced screed? (timber 'I' beam on acrows giving mid span support, till it all goes off) Still looks a long span though, unless 8"/200mm beams used.
Two considerations; bounce and drumming if it's stretched. (aren't they members?)
Good progress Olive - you'll be in before Christmas.
|
A cross member.
|
|
|